We have almost completed the rough frame for the bathtub. All we need to do is wait for the plumbers to put in the rest of the pipes and finish off the concrete blocks. It took most of the weekend and a few early mornings to get it to this point, but everything seems level and the bathtub should slide right in. Honestly, we measured it. Twice.

On the outside the painter has put the first coat of stain on and is starting on the second. The color is a little darker than we expected, but it looks quite nice in the sunlight. He should finish up tomorrow or Saturday and then we are left to our own devices for the interior.

While we were working on the tub, my wife's father continued with the wiring. Our architect/builder decided to lend us a hand and put down the
subfloor. We put in the insulation and he did all of the hard work. The floor is about half done and it will be another week or so before we can finish it.
I took care of a few more little things as well. I screwed metal brackets to the extra supports in the interior walls for earthquakes and drilled some large holes in the walls for the ventilation system. Now our recently water-proofed house has eight 10cm holes in it.