We have used this downtime to make final decisions on the roof color, the interior flooring, doors, and interior wall designs. I have had to leave most of the decisions to my wife, since I have absolutely no interior design skills. She will be leaving most of the hands on work to me, even though I have absolutely no carpentry skills. There may be a slight flaw in this arrangement.
Friday, July 4, 2008
A Brief Delay
Now that the foundation is finished we can move on to framing. However, the framing has been pushed back until around the 14th of July. We had originally planned to use some local carpenters for the framing of the house, but they were unavailable so we lined up carpenters from a nearby town. Due to another project being delayed, the local carpenters are now available for our house but not for another week or so. It is worth the wait though since the local carpenters have more experience building in this area and they are cheaper.
Tuesday, July 1, 2008
Foundation Finished
I dug a hole with the intention of building a wood frame for the concrete. Since the plywood was too large, I fired up the circular saw for the first time on this build and managed to cut the wood and not my fingers. Impressed with myself, I strolled over to the hole and started to screw the boards together. For this I used my handy electric screwdriver/drill, a wedding present that makes an appearance once every 4 - 6 months and has a fancy laser-like light that points right at the screw head allowing you to use it in total darkness. Designed for nocturnal carpenters, I should have known better than to use it in broad daylight.
I managed to slip the screw driver off of the screw head and shove it right next to my thumbnail. It made it in about a centimeter before I had the presence of mind to release the trigger. But the blood seemed to grease the screw a bit and it went right in after that. Job done.
Thursday, June 26, 2008
Plumbing Work
Since we are doing the electric ourselves, it is inevitable that there will be a few small hurdles to overcome. The most recent problem was the length of the plastic pipe we buried from the power pole and fed under the foundation. It seems the pipe that we are going to feed the telephone line through was so short that it would end up below the concrete floor level, thus rendering it useless. After assesing the feasibility of building an intricate network of string and tin cans to replace the phone, I realized that I had some extra plastic piping. So with a little tape and a 30cm length of pipe, I ensured that we will be disturbed at least once a month during dinner by someone trying to sell us the latest green tea fad diet. This pipe will also be our conduit to Internet shopping, but at a much slower rate than I had hoped.
Our little village has been subjected to a broadband Internet monopoly that easily rivals anything in China. The provider charges insane setup fees and yet they do not have the resources to provide broadband to everyone in our huge metropolis of 2,000 people. For the last two years, the entire village has been lobbying the national phone company, NTT, to come in and oust the oppressors. They have finally arrived and there are now multiple providers going door to door soliciting business. Free setup, free service for 2 months, the list goes on. But not all the way to our house. The area that can be serviced before this winter literally stops about 200 meters from our house. So it could be another year or two before we can illegally download music and movies at high speed.
Wednesday, June 25, 2008
More Foundation Work
The Styrofoam will become a permanent part of the foundation so we will cover it in mortar and attach either stone or brick.
Our self installed electric pole remained standing and the base is now a meter deep in concrete. We fed the cables under the foundation and they are now safe and secure on the interior of the house. Hopefully everything is set up correctly or we will be spending a lot of time chipping away at concrete.
Sunday, June 22, 2008
Foundation Continues
Friday, June 20, 2008
Electric Poles and Toilets
The hole in the ground continues to expand and the framing for the foundation is nearly done. Today we attempted to install the permanent power pole and it went in without a hitch. Assuming the Shinto priest did his job properly, we will not encounter any high winds or earthquakes over the weekend and the concrete will go in on Monday. Normally, high winds would not be a problem, but the stabilization method we employed for the power pole is not exactly orthodox. As you can see from the photos, we used bits of the recently felled trees to support the pole until the concrete is poured on Monday. On the upside we provided endless amusement for the foundation guys, but on the downside I think they may now realize that I don't actually have any idea what I am doing. But really, how hard can it be to build the entire interior of a house? (Cue dramatic music foreshadowing imminent disaster).
On a side note, we now have a toilet. While peeing in the bushes up until now has been fun, I think the neighbors will appreciate our pale, blue outhouse.
Thursday, June 19, 2008
Great Big Hole (Relatively Speaking)
If the sun makes an appearance tomorrow, the foundation frame will be completed and the concrete will be poured on Monday. On the DIY side of things, we need to build a box for the base of the permanent power pole and dig the hole for it. Then on Monday we will put the pole up and fill in the hole with concrete. Sounds simple. I may even be able to get this done on the first try, but I'm not taking bets.